Ask About Your Tarmac Driveway

Tell us about the driveway, laneway or yard you want tarmacked in Newbridge and ask us for a free estimate.

Why Choose Us

Edges Fixed First

An edging kerb or a border goes in first and the tarmac is laid inside it, because an unretained edge is the first place tarmac fails.

Laid in One Run

Tarmac has to bond to itself, so each area is laid in one run with no joining lines. On a large area we plan the stopping points first.

Falls and Drainage

We set the falls so water never pools on the tarmac, running it to channel drains and on into existing drainage or a soakaway.

Rolled 804 Base

On a new installation the old surface and sub-base are dug out and a fresh 804 base is compacted with a vibrating roller of around 20 ton.

No reviews found.